Project Snapshot

  • OWNER: Balance Mobility Aquatic Center, LLC
  • TYPE OF BUILD: Design Build
  • PROJECT SCHEDULE: 6 months
  • PROJECT SIZE: 9,078 sq ft

Project Overview

The facility includes a large physical therapy gym, multiple individual treatment rooms, a 26 ft x 12 ft warm water therapy pool and multiple balance assessments and treatment devices. To accomodate for the indoor pool, the team had to take special steps to ensure the humidity levels in the rest of the building would be controlled regularly and not affected by the pool.